工厂生命周期中的eShare
工业投资的终极资产管理工具。

Engineering
From FEED phase to detailed engineering – consolidate 3D and 2D engineering documentation and manage changes
Procurement
Linking of procurement specifications and progress reports with 3D model
Commissioning
Storing equipment certification and test pack information from suppliers and updating information with engineering data and construction status and comments.
Construction
Visualization of constructability status in 3D and integration with prefabrication analysis, site warehouse management, prefabrication and construction progress monitoring.
Operation
ink on-site online data and engineering project information. Use of any operational data for visualization in 3D.
Maintenance
Integration of engineering 3D model and maintenance management (MMS) and ERP systems.
Revamping
Combining 3D models with as-operating laser scan information and tracking status for dismantling.