The team can use the same project-specific settings, product model libraries, product databases, information about the project equipment, etc. The project tree has centralised design data on the whole project available for the whole team in real time.
The tree-style Project Tree view improves design data management and reduces errors. With the real-time project tree view you
- manage the project’s design data in a centralised way
- find project information and stay on track about what is located where as the project progresses
- have a centralised view of information on devices, and the connection information and product models of cables and their wires as well as individual wires, among other things
- add design data imported from different applications into other document types
- are always up to date on whether the design data in the CADMATIC Electrical drawings is already in use or if it still needs to be added.